Project Solis · Gallup, New Mexico

American energymanufacturing.

A proposed advanced-manufacturing campus bringing solar-cell and solar-module production, hundreds of jobs, and long-term investment to Gallup, New Mexico.

Status
Under financing
Location
Gallup, New Mexico, U.S.A.
Capacity
3.6 GW cells · 3.0 GW modules
Investment
Up to $5 billion, across all phases

Convalt Energy has entered into a binding Purchase and Sale Agreement with Gallup Land Partners (GLP) to develop an advanced manufacturing campus in Gallup, New Mexico, approximately two hours from Albuquerque.

The campus will integrate three operations:

01

Solar Manufacturing

Production of solar cells and modules.

02

Power Generation

Up to 1 GW of behind-the-meter capacity to directly serve manufacturing operations.

03

Water Treatment

A reverse-osmosis plant with 3 million gallons per day of treatment capacity, producing process water from treated sewer effluent.

Solar-glass manufacturing is contemplated for a future phase, subject to separate review and approval.

Clarification

This is not a data-center project

The Gallup project is an advanced-manufacturing campus that produces physical components for the solar-energy industry. Its computing and automation systems exist to support manufacturing functions — production control, quality assurance, inventory management, logistics, and security — not to house third-party data-center operations.

Manufacturing

What will be manufactured

These are essential components of America’s growing domestic solar-manufacturing supply chain.

3.6 GWSolar cells — HJT-technology cell manufacturing as the campus’s first production phase. Planned capacity of 3.6 GW.
3.0 GWSolar modules — Finished solar panels for residential, commercial, and utility-scale use. Planned capacity of 3.0 GW.
FutureSolar glass — Future phase, subject to separate review and approval.

At full buildout

Real jobs. Real investment. Real impact for Gallup.

Up to $5 billionTotal investment (full buildout)
~900Permanent jobs at full buildout
1,000+Construction jobs
Up to 1 GWBehind-the-meter power capacity
Through 2028Initial construction window

Initial construction is anticipated to proceed through 2028, although the schedule may evolve as financing, design, and permitting advance. Final job counts, investment levels, and phase timing will depend on project execution and market conditions.

Wages

What the jobs pay

$69,000Average annual wage
$28/hrAverage hourly rate
$25/hrLowest hourly rate

Context

Gallup poverty rate in context

Gallup, NM26.8%
New Mexico~17–18%
United States~11–12%

Rates vary by source and year. If developed as planned, the project’s employment and investment could contribute meaningfully to closing this gap over time.

Community

How will the community benefit?

If developed as planned, the project has the potential to:

01

Jobs (direct + indirect)

  • ~900 permanent jobs at full buildout.
  • Additional construction and supplier jobs.
  • Broader regional employment.
02

Construction employment

  • Create 1,000+ construction jobs.
  • Support skilled trades and contractors.
  • Create engineering and logistics employment.
03

Career growth

  • Create accessible entry-level careers.
  • Prefer high-school diplomas for many roles.
  • Offer training and long-term career growth.
04

Employee housing

  • Develop 3D-printed employee housing concepts.
  • Aim to improve housing availability.
  • Target lower residential construction costs.
05

Employee ownership

  • Offer ownership opportunities to eligible employees.
  • Strengthen compensation and retention.
  • Support long-term wealth building.
06

We create our own water

  • Treat allocated municipal effluent onsite.
  • Produce water for industrial use.
  • Invest in reliable wastewater reuse infrastructure.
07

We create our own power

  • Primarily power campus with behind-the-meter generation.
  • Combine solar, batteries, and gas-engine backup.
  • Reduce reliance on Gallup’s grid.
08

Onsite clinic

  • Support health clinic development.
  • Plan preventive care for employees and Gallup residents.
  • Extend planned access to neighboring tribal communities.
09

Advanced manufacturing

  • Expand Gallup’s manufacturing base.
  • Diversify the regional economy.
  • Strengthen Gallup’s national solar and clean-energy role.
10

Fiber connectivity

  • Strengthen campus fiber-optic connectivity.
  • Support broadband capacity across Gallup.
  • Expand digital access and economic opportunity.
11

Agri-voltaics

  • Combine solar generation and agriculture across 100 acres.
  • Support agricultural jobs and local economic activity.
  • Create opportunities for additional farm income.
12

Local resources

  • Prioritize qualified local businesses and workers.
  • Expand opportunities for contractors and suppliers.
  • Keep more project spending in the region.
13

Regional water

  • Support a separate sister-entity desalination initiative.
  • Target up to 100 million gallons daily for New Mexico.
14

Generate tax revenue

  • Generate construction and operating tax revenues.
  • Expand payroll, property, and related tax revenues.
  • Benefit Gallup and McKinley County.
15

Solar for McKinley

  • Expand local solar access for McKinley County businesses and residents.
  • Support lower energy costs.
  • Strengthen energy independence.

Water

How the water works

Allocated effluentOnsite reverse osmosisManufacturing use

Water availability is a key concern for major industrial projects. Convalt Energy will not use Gallup’s drinking-water supply for its manufacturing processes.

Effluent treatment

The planned onsite plant will treat approximately 1 million gallons per day of City of Gallup sewer.

Delivery infrastructure

Water will flow through an existing Gallup Land Partners pipeline, with Convalt funding the connecting pipes.

Water reuse

Treated water will be recycled across manufacturing and power operations.

Community allocations

Manufacturing will use only effluent already allocated to the project, preserving unallocated supplies for future municipal and community needs.

Power

How the power works

Solar + battery + gas backupBehind-the-meter generationCampus operations

“Behind the meter” means generating electricity primarily to serve the campus directly, reducing reliance on the city’s electric system for the project’s full operating demand.

Planned capacity

Up to 1 GW integrated into the industrial campus, rather than a separate utility-scale power project.

Energy mix

Solar generation, battery storage, and gas engines to support operations when solar output is insufficient.

Emissions and noise

Gas engines will incorporate emissions controls and noise attenuation.

Regulatory compliance

The system will comply with applicable air-quality, noise, safety, and construction requirements.

Place

Why Gallup?

Gallup’s economy was shaped by energy. The proposed Convalt Energy project builds on that heritage through advanced manufacturing and solar energy, advancing Gallup’s role as America’s energy needs and technologies evolve.

Energy heritage

Coal mining, uranium, oil refining, and related industries shaped Gallup’s economy and communities.

Development groundwork

Gallup Land Partners has spent over a decade investing in infrastructure, land planning, and regional partnerships.

Industrial evolution

Convalt’s proposed campus builds on this heritage through advanced manufacturing and solar energy.

Economic diversification

Solar manufacturing would broaden Gallup’s industrial base.

Employment potential

The project aims to create skilled jobs and support long-term economic growth.

Convalt Energy

Convalt Energy timeline

  1. 2011

    Convalt Energy founded, initially focused on renewable-energy projects internationally

  2. 2013–20

    Renewable power development in Southeast Asia and Africa

  3. 2021

    Pivoted to U.S. solar manufacturing; acquired panel equipment for a New York facility

  4. 2025–26

    Scaling U.S. solar-panel production; advancing the Gallup, NM project

01

Infrastructure planning

Coordinating utility and water requirements.

02

Public participation

Public hearings and required reviews will provide opportunities for questions, evidence-based evaluation, and community input as the project advances.

03

Approvals and review

Progressing through land-use approvals, permitting, and environmental review.

04

Financing and design

Advancing financing, final engineering, and design.

Construct with capital and conscience.

Convalt Energy / Gallup, New Mexico

Is this a data center?

No. This is an advanced-manufacturing campus producing solar cells and solar modules. Computing systems on site support manufacturing operations, not third-party data hosting.

Will this use Gallup’s drinking water?

No. The project will use only previously-allocated treated effluent (sewer water), further processed onsite via reverse osmosis. It will not draw on drinking water or on unallocated effluent reserved for future community needs.

Will this strain the local power grid?

The project intends to meet its own power needs primarily through onsite behind-the-meter generation (solar, battery storage, and gas-engine backup) rather than relying on Gallup’s existing grid.

How many jobs will this create?

Approximately 900 permanent jobs at full buildout, plus 1,000+ construction jobs during development.

When will construction begin and finish?

Initial construction is currently anticipated to proceed through 2028, though timing may shift with financing, design, and permitting.

How can I get involved or ask questions?

Through public information sessions, hearings, and the project contact channels listed on this site.

Project Solis

Questions about
the Gallup campus?

Residents, suppliers, partners and press: reach the Project Solis team through our contact page and we will route your question to the right person.

Contact the team